

Alternating closures on Rte. 301, full closure delayed
A section of Route 301 will see closures in alternating directions this week to allow for the grading and paving of a five-kilometre stretch of
Trending:


A section of Route 301 will see closures in alternating directions this week to allow for the grading and paving of a five-kilometre stretch of


Transports Québec has confirmed the 1.5-kilometre stretch of Route 301 that was set to be closed this week has remained open as planned construction work


Transports Québec has announced that a 1.5-kilometre stretch of Route 301 will be completely closed to traffic in both directions from Monday, July 27 until


A section of Route 301 will see closures in alternating directions this week to allow for the grading and paving of a five-kilometre stretch of the road. In a July 31 email notification, Transports Québec said the road between chemin


Transports Québec has confirmed the 1.5-kilometre stretch of Route 301 that was set to be closed this week has remained open as planned construction work has been delayed. In a July 24 alert, the ministry said the road between Route


Transports Québec has announced that a 1.5-kilometre stretch of Route 301 will be completely closed to traffic in both directions from Monday, July 27 until Tuesday, Aug. 4 to allow for the replacement of a culvert. The affected stretch of
Unfortunately, Meta (Facebook’s parent company) has blocked the sharing of news content in Canada. Normally, you would not be able to share links from The Equity, but if you copy the link below, Facebook won’t block you!
Thanks for visiting! Support quality local journalism by subscribing to The Equity today or register for free and get access to a limited number of articles each and every month.
Already subscribed? Click here to log in.